Another big 3 days worth of updates inbound. Starting things off with replacing the gearbox pins and new clutch assembly.
Sturdy ZF gearbox.
All the new bits ready to be fitted
Old pivot arm looking very worn on the pivot point.
Also release bearing not looking great.
First of the shift pins going in
they’re the easy ones.
then onto the main problem pins, you can see here the liner worn
that’s reverse and 5th gear fixed
full house, all pins replaced
With the gearbox out it would be rude not to fit new seals. First main seal removed
new seal in
then the selector seal, this seal is always the one leaking.
new hardware ready, pivot arm, pivot pin and release bearing.
with the gearbox done we installed the clutch assembly
followed by pressure plate
now ready for the gearbox
hour later and she’s all torqued up with a new Guibo bush.
lots of work going on in the engine bay over the last two days. We noticed way too many cracked vacuum lines so it was time to tidy it all up and get the engine running right. First thing we did was fit some new Aux belts and remove the cat blower unit.
new throttle cable in and now running the correct route.
brake components also got a touch up with paint to help them stay tidy over the coming years.
exhaust system also went on.
vacuum boost finally removed. Blank fitted to the engine and all the vacuum lines removed.
everything that was removed
Engine bay looking tidier, just a couple bits left to arrive to seal up that intake system.
the spare wheel carrier also went back on followed by the wheels.
we have a couple of bits left to fit, full service kit to do and she’s booked in for a two day ceramic Coat. Also all the power steering lines need changing, luckily all these bits are straight forward. She’s nearly there now!