the weight is dropping off me, digging out, laying your slabs, and lifting timber all over the place.
Makes a change from sitting on your arse at work
the weight is dropping off me, digging out, laying your slabs, and lifting timber all over the place.
You're doing a grand job mate. I've been labouring for our Gary, but, he is replacing double glazed units at home. And we had to feed him !!
Tony.
You wouldn't want to see us struggle doing our own jobs and starve![]()

This is a cracking looking job. Coming along very nicely. Keep updating please. It’s fascinating to read and see the progress being made. Your Z will have a very nice home.Been pretty busy recently. After a lot of heavy rain we got some hardcore down on the garage base and got it compacted down, it was a bit sloppy in places but it soon dried up nicely after a week or so of better weather.
View attachment 148691
View attachment 148689
We then got some more hardcore for the patio area and whacked this down so it was nice and solid. A lot of the soil I used to level it up was removed again as it was just too mushy so we filled this with harcore and it is now much better.
View attachment 148739
The garage base was now ready for the concrete slab, we put a pipe in for the concrete to be poured around to allow the electrics to be buried in the ground upto it and then through the base into the garage. Also a layer of damp proof membrane was put down for the slap to be poured onto.
View attachment 148737
One of the few things we have never done and didn't fancy doing as it was a job that needed doing properly was pouring and smoothing out the concrete for the floor. So I had a few quotes for people to do it for me and in the end I ordered the concrete myself pre mixed and had a couple of guys do the labour. By the time we had bought wellies and hired tools to rake and level the base also it worked out cheaper to get someone to do it and it would save us trying to learn on such a big area.
View attachment 148743
View attachment 148741
They did a great job nice and level as well as smooth.
View attachment 148745
Between the edge of the drive and the garage will be gravelled to help with drainage and should leave a nice area to wash the cars. There is an inspection chamber which will sit too low so this has been raised up. I also put a new downpipe on the conservatory leading into a drain and pipe directly to the inspection chamber. Before the downpipe was just sunk into the mud, meaning the water just soaked into the ground which was useless. The spare offcut of drainage was used on the other side with some holes drilled in the top half for another soak away.
View attachment 148747
View attachment 148757
View attachment 148759
View attachment 148761
I got a new exhaust for the zed but I wasn't keen on the colour
View attachment 148749
A trench has been dug for the amoured cable which will supply electric to the garage. The cable will run alongside the soak away pipe that was already in place.
View attachment 148767
View attachment 148751
The shuttering has been removed, most of the edges packed up ready for some gravel to go around and the base has had 3 coats of sealant.
View attachment 148763
@gookah didn't do a bad job cementing in the new height of the chamber.
View attachment 148765
Just waiting for the timber to be delivered so we can start building the garage.

Looks really great @g8jka
Are you insulating the walls?

The best part for me would be the smell of wood being cut and worked. Love the finnial mate, the icing on the cake. Are you having a motorised up and over door?
Tony.
I was going to use a roller when I had mine done mate but as the garage is a sectional building it would have been too heavy so went with the up and over. Only drawback is that you have to park 2ft away from the door to allow it to swing upwards, but it does finish flush with the front of the garage when it's open. It'll be good fun planning where to put shelves and storage etc.
Tony.