As the list for Lee's work is growing I think I've found a solution
Purchase 1 salvage subframe and 3 sets of swing arms one for the narrow body, one for widebody and one for facelift and can get everything ready before the arrival.
3 hours to strip similar to rebuild job is all done in a day and still time for T
Purchase 1 salvage subframe and 3 sets of swing arms one for the narrow body, one for widebody and one for facelift and can get everything ready before the arrival.
3 hours to strip similar to rebuild job is all done in a day and still time for T